Execution of the Works on Belgrade Bypass Project,
Construction of Highway E70/E75, Sector B,
Section: Bridge over Sava River near Ostruznica – Bubanj Potok (Sectors 4, 5 and 6),
Republic of Serbia
2018 - 2023

Texniki parametrlər və iş həcmləri:

Length
20.34 km
Number of traffic lanes
4 lanes
Width of traffic lane
3.75 m (4 x driving lanes),
3.00 m (2 x emergency lanes),
0.50 m (2 x emergency stopping lane beside median),
0.50 m (2 x emergency stopping lane between driving and emergency lane),
4.00 m (1 x median),
1.50 m (shoulders)
Earthworks - cut
1,459,474.33 m3
Earthworks – fill
1,473,772.64 m3
Asphalt works
191,194.70 tons
Sub-base
17,865.40 m3
Base course
62,966.93 m3
Number of bridges
7 ea
Number of tunnels
3 ea

Belgrade Bypass Project consists of three sections A, B and C. At the moment, as a subcontractor to Powerchina, Azvirt is conducting following works at Section B:

Sector 4
Construction of the whole alignment km 578+150 – km 585+867,
Sector 5
Asphalt Pavement Works km 585+867 – km 588+916.3
Sector 6
Construction of the main alignment km 588+916,3 - km 593+150 with construction of a bridge and Tunnel “Beli Potok”, and asphalt pavement works at km 593+150 – km 598+489,89

Employer: Power Construction Corporation of China, Limited, No. 22, Chegongzhuang West Avenue, Haidian District, Beijing, 100048, People’s Republic of China, Power Construction Corporation of China, Limited Branch office Beograd, Bulevar vojvode Mišića 15, 11000 Beograd, Republic of Serbia (The Main Contractor)

Construction works were completed on July 3, 2023.