Construction of Zangilan International Airport
2021 - 2022
Technical specifications
Length of runway
3000 m
Width of runway (with shoulders)
60 m
Area of apron
60 000 m2
Area of taxiways
23 000 m2
Work volumes
Earthworks (excavation and embankment)
2 050 000 m3
Capping layer
96 800 m3
Base course
63 700 m3
Asphalt-concrete mixture
208 000 tons
Construction works were stared in May, 2021.
Zangilan International Airport was commissioned with opening ceremony on October 20, 2022, with the participation of President of the Republic of Azerbaijan Ilham Aliyev and President of the Republic of Turkey Recep Tayyip Erdogan.