Design, Supply and Installation of Mechanical, Electrical, Power and IT Equipment for Manajle and Predejane Tunnels, E75 Highway, Corridor X,
Republic of Serbia
2018 - 2019
Technical Parameters and work volumes:
Number of tunnels
2 double tube tunnels
Predejane
left tube 873.77 m,
right tube 1.072,77 m
right tube 1.072,77 m
Manajle
left tube 1.808,70 m,
right tube 1.800,00 m
right tube 1.800,00 m
Employer: Koridori Srbije d.o.o. Belgrade, Kralja Petra 21, Serbia,
Contract duration: October 2018 – May 2019
The scope of works in this Project consists of design, supply and installation of the systems vital for traffic and tunnels functioning. Fire protection system; Telecommunication system; Traffic information system; Tunnel lighting; Tunnel power supply; Tunnel ventilation system; Design of Control and Management Plans; Tunnel information system; Electronic communications network were installed and the latest technology for all systems has been applied.
Corridor X, south section has been opened for traffic on May 17th, 2019.