Technical specifications and work volumes of the road:

Total length of the road
21,60 km
Width of traffic lane
3,75 m
Number of traffic lanes
4÷6 lanes
Road pavement
528 000 m2
Thickness of asphalt-concrete pavement
270 mm
Earthworks
2 600 000 m3
Capping layer
254 000 m3
Base course
216 000 m3
Asphalt-concrete mixture
350 000 ton
Concrete kerb stone
55 800 pm
Steel hand rails
18 880 pm

Construction works were started in June, 2012.

The road, which was reconstructed under the Plan of Action for the execution of the 2014-2016 State Program on the socioeconomic development of Baku and its suburbs, is nearly 22 km in length.

First section of the motorway Gala-Pirallahi was opened on October 14, 2016. The length of the first section is 15 km. High-quality construction work was carried out at the four-lane facility.

The road was previously too narrow, which hindered traffic and led to its congestion. It was expanded to 19 metres, and this will ensure easy and unhindered movement of vehicles.

Being a part of the state program, this project is primarily aimed at ensuring transport communication in the direction of the city centre and Gala and Pirallahi.

According to the project, road junctions and pedestrian crossings were built.

Second section of the road with the length of 7 km was inaugurated on December 26, 2016. Construction of the road has been fulfilled under the Plan of Action for the execution of the State Program on the socioeconomic development of Baku and its suburbs, and also Additional Plan of Action for developing transport system of Baku city.

7 km length section of Category 1 motorway Gala-Pirallahi has 6 lanes. The width of each lane is 3.75 m. Total width of the road is 34 m. Sidewalks have been constructed in order to ensure comfortable and safe movement of passengers. Drainage line has been built along the motorway. Fourteen bus stops were built along the road. All works were executed according to work schedule, proper to technological order and with high quality.