Construction of access roads, engineering structures and underground pedestrian passages to the 4÷6 km section of Baku-Alat motorway
2013 - 2015

Technical specifications and work volumes of the road:

Total length of the road
7,10 km
Width of traffic lane
3,75 m
Number of traffic lanes
4÷6 lanes
Road pavement
147 000 m2
Thickness of asphalt-concrete pavement
270 mm
Earthworks
733 000 m3
Capping layer
64 000 m3
Base course
35 500 m3
Asphalt-concrete mixture
71 600 tons
Number of pedestrian bridges
1 ea
Various diameter drainage pipes
9 100 pm
Concrete kerb stone
19 000 pm

Construction works were started in April, 2013.

Opening ceremony of access roads on the 4th-6th km of motorway Baku-Alat-Qazakh-State border with Georgia and a pedestrian underpass in Bayil Boulevard was held on June 8, 2015. Construction works were executed in a short time and with high quality by using modern technologies. New motorway plays an important role from the view point of safe and convenient movement of traffic in this area. This motorway will contribute to the development of transport infrastructure of the capital of our country. The underpass is 226 metres in length, 4 metres in height and 8 metres in width. It will provide safety for people coming here. There is also a special installation for the disabled persons. The underpass has four exits and eight excalators. It will provide safe movement of people in the direction of Ahad Yagubov street, State Flag Square and Bibiheybat mosque road.