Construction of Gabala – Agdash motorway (0 - 22 km)
2011 - 2013

Technical specifications and work volumes of the road:

Total length of the road
22,00 km
Width of traffic lane
3,50 m
Number of traffic lanes
4 lanes
Road pavement
357 000 m2
Thickness of asphalt-concrete pavement
240 mm
Earthworks
1 100 000 m3
Capping layer
176 800 m3
Base course
101 000 m3
Asphalt-concrete mixture
231 000 tons
Number of bridges
1 ea
Number of pedestrian bridges
5 ea
Various diameter drainage pipes
7 700 pm
Concrete kerb stone
38 900 pm
Steel hand rails
7 500 pm

Construction works were started in July, 2011.

Construction works were completed in 2013.