Technical specifications and work volumes of the road:

Earthworks
219 000 m3
Sub-base course
75 000 tons
Base course
50 000 tons
Asphalt-concrete mixture
79 000 tons
Closed drainage works
658 pm

Reconstruction of airfield and territories surrounding the cargo terminal, access road to Zagatala Airport.

Reconstruction works were started in August, 2006.

The reconstruction of runway (80 763 m2), apron (10 450 m2), taxiways approach and internal roads (19 496 m2) were performed by the Company.

On September 19, 2008, an inauguration ceremony for the airport was held.