Technical specifications and work volumes of the road:

Earthworks
750 000 m3
Sub-base course
230 000 tons
Base course
125 000 tons
Asphalt-concrete mixture
214 000 tons
Closed drainage works
9 000 pm

Reconstruction of airfield and territories surrounding the cargo terminal, access road to Lankaran Airport.

Reconstruction works were started in August, 2006.

The Company performed works for the purpose of reconstruction of runway (210 789 m2), apron (40 267 m2), access road to the airport (18 330 m2), cargo terminal (33 648 m2).

In order to increase resistance of soil course, 240 000 m2 of geogrid material was placed.

On October 08, 2008, the airport was put into operation.