Construction of Lachin International Airport
2021 - 2023

Technical specifications:

Length of runway
2800 m
Width of runway (with shoulders)
60 m
Area of apron
60000 m2
Area of taxiways
6400 m2

Work volumes of aerodrome areas (runway, apron, taxiways, forecourt and internal roads):

Excavation works (with blast method)
6 900 000 m3
Embankment works
3 800 000 m3
Capping layer
83 000 m3
Base course
54 000 m3
Asphalt-concrete mixture
196 000 tons

Construction works are planned to be started in 2021 and completed by the end of 2022.