Construction of new 8 lanes motorway, road junctions, engineering structures and underground pedestrian passages parallel to Nobel Avenue
2013 - 2015

Technical specifications and work volumes of the road:

Total length of the road
2,20 km
Width of traffic lane
3,75 m
Number of traffic lanes
8 lanes
Road pavement
90 000 m2
Thickness of asphalt-concrete pavement
270 mm
Earthworks
972 000 m3
Total length of the road
50 000 m3
Base course
29 500 m3
Asphalt-concrete mixture
58 000 tons
Number of pedestrian bridges
3 ea
Various diameter drainage pipes
3 000 pm
Concrete kerb stone
15 300 pm

Construction works were started in April, 2013.

Construction of new 8 lanes motorway, road junctions, engineering structures and underground pedestrian passages parallel to Nobel Avenue
 

The new motorway is situated near to White City boulevard. Three pedestrian underpasses, each with eight metres in width were constructed for safe movement of people having a rest here.

Construction of new 8 lanes motorway, road junctions, engineering structures and underground pedestrian passages parallel to Nobel Avenue
 

Official opening ceremony of the road was held on March 15, 2015.

Construction of new 8 lanes motorway, road junctions, engineering structures and underground pedestrian passages parallel to Nobel Avenue